EXPERIENCIA |
Kellogg Cardon CA Construction/KBR INTERNATIONAL 5/ 1992 - 12/ 1995 CARDON PDVSA Refinery Expansion Project (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Construction Supervisor
Duties & Responsibility
Coordinate as a focal point with PDVSA authorities.
Permit To Work Requester before starting activities of project.
Coordinate surveying the Areas assigned to construction of Project.
Coordinate drawings per each zones to development.
Elaborate Permit to Work according PDVSA standards.
Realize daily report of activities.
Coordinate SIMOP activities with Operation Team
Keep A Safety Walkdown Reports |
Inelectra Proyecto Engineering. 6/ 1996 - 12/ 1997 PDVSA Topographic Survey & Geotechnical (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position Survey & Geotechnical Studies Coordinator
Duties & Responsibility
Prepare a technical specifications to development of Engineering basic, Procedures, Manuals, and specifications.
Coordinate the Team in site/ Control man-hours Evaluate geotechnical Methods to be used in site./
Elaborate the Geotechnical reporting final of site. Review the preparation all Geotechnical drawings / daily weekly and monthly report progress. |
Kadco of Venezuela. QA/ QC INSPECTION 1/ 1998 - 12/ 2000 PETROZUATA Extra Heavy Oil Plant Project (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position QC Civil Inspector
Duties & Responsibility
Monitoring the activities of EPC Contractor./
Elaborate QA/QC Daily Report Performing Site inspection according to ATP /
Sign the ATPs Performing the Steel Structure Erection /
Report Standards and Procedure approved Monitoring the Insulation works./
Performing the walkdown to elaborate Client Punchlist Monitor the contractors for competence on all aspects of civil construction. |
Contrina(s) of Venezuela / Proyecta Construction. 12/ 2000 - 11/ 2001 SINCOR Extra Heavy Oil Plant Project Jos (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Thermal Insulation Supervisor
Duties & Responsibility
Performs field inspections and provides reports of execution.
Verify the technical specifications and scope of work to be executed.
Provide technical advice and guidance on all details to execute the installation.
Elaborate Request of (BOM) according the quantities from Engineering design concepts.
Facilitate technical assistance during pre-inspection and Handover of Insulation Subcontractor in activities in site.
Review drawings d, specifications technical and materials used. |
Servicios CUYUNI ETT.C.A/ Tecnoconsult Construction 4/ 2002 - 2/ 2005 Hamaca Extra Heavy Oil Plant Project Jos (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position QA Civil Inspector
Duties & Responsibility
Contract as a Shutdown Mechanical Supervisor and coordinator of painting and insulation. responsible of the activities and the commissioning
Preparing daily report of activities Material inspection and receiving, piping erection, structure steel erection, insulation made in the shop.
Release to final approval. Surveillance and Inspections to verify compliance with contract specifications. |
BP Holding Limited Venezuela Branch 7/ 2005 - 7/ 2006 Shutdown General Maintenance Compressors (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Mechanical Supervisor
Duties & Responsibility
Planning, organizing, and carrying out the planned shutdown activities of the equipment and units. Management of Work packages in accordance with Scope of work defined by Operation.
Applying and Assure the safety rules and procedures approved the planning and coordinating the task of civil and mechanical the elaboration daily of the reports of progress.
Verification of daily the safety items according the operating instruction.
Daily meeting with operation and maintenance teams in case of any deviation.
Support the ongoing construction activities by displaying a good awareness of HSE |
Vepica S.A Construction 11/ 2006 - 5/ 2007 Corocoro Project workshop GUIRIA Venezue (Venezuela) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Client Representative
Duties & Responsibility
Client Site representative, to inquiry inclusive of detailing services as well as scheduling meetings/calls with High management.
Development personal HSSE leadership and excellent HSE behaviors and ensure that safety expectations are communicated and maintained.
Provide support for QA personnel performing inspections in site. Observes safe working practices, safety rules, and regulations by becoming familiar with correct SOP & HSE procedures.
Communicating effectively with employees, Contractor representatives and/or other third-party service companies.
Certification with your signature, the execution of the work in each of the steps established according to the IPT of the project.
Project Name & Location Shutdown General Maintenance Compressors Planned 2005 Boqueron Venezuela. |
Tecnicas Reunidas Construction KSA Branch 6/ 2007 - 6/ 2010 Hawiyah Gas-Plant Expansion Project Saud (Arabia Saudí) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Civil/Structure Supervisor.
Duties & Responsibility
Coordination all erections works inside the plant, risk control.
Controlling and monitoring Work Instructions progress in with Supt’s & Project. Insure operational and maintenance conditions routinely of plant.
Solvent in field claims from our Client ARAMCO.
Perform a role of Leader in field to support at ARAMCO team with our simultaneous jobs.
Review of work pack for required details and constructability.
Participate in on site activities through to hand over to Commissioning/Operations as required |
Tecnimont Do Brasil TW Brazilian Branch 10/ 2010 - 2/ 2012 Itaqui Electrical Power Plant Project Ma (Brasil) |
| Position Senior Quantity Surveyor Site Coordinator.
Duties & Responsibility
Coordinating to verify the construction methods and procedure used in site / To do correction in interference issue.
Elaborate for each discipline payment according Tecnimont-BH standards, cost control and KPI of project.
Delivery of all aspects of procurement of work packages, consultants, suppliers, and the like from inception of a project through Works on projects of diverse scope.
Where analysis of situation or data requires evaluation of a variety of factors and appropriate problem solving. |
Tecnicas Reunidas UAE Branch 4/ 2012 - 5/ 2014 Shah Gas Development-Project (SGD) UAE. (Emiratos Árabes Unidos) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Civil Supervisor.
Duties & Responsibility
Performs field inspections and provides professional field support as necessary during construction phases.
Prepares Request for (STQ) from site about with concerns from construction team.
Prepares and reviews technical correspondence, reports and studies.
Perform other responsibilities associated with the position as may be appropriate.(Safety conditions Site Observations).
Monitored the contractors, for competence, during construction on all aspects of civil construction/
Daily Reports All earthworks.
Concrete & steel works/mechanical task review all specifications. |
SK Engineering &Construction / Site construction. 7/ 2014 - 12/ 2017 Esmeralda (Ecuador) |
| Construcción - Mantenimiento (Coordinador) |
| Position Site Steel Structure/ Dismantling Mechanical Supervisor / Painting Supervisor .
Duties & Responsibility
Permit to Work (PTW) Issuer to executing the daily tasks/ Daily Activities Report. In Phase 1.
Performing of Day shift activities for dismantling of the Catalytic Cracking unit./ Daily Report.
Dismantling of Furnaces, reformer, Heaters and Reactor./ Complying the execution plan In Phase 2.
Night shift, Supervision of welding reinforcements in bases plate of the structure for the Catalytic/
Performance Supervisor In Phase3.Piping Supports, Insulation and Painting Supervisor of process lines./
Site Supervisor quantity control. |
QCS - Quality Consulting & Vendor representative. 1/ 2018 - 12/ 2018 Talara.Piura (Perú) |
| Consultoría - Asesoría (Asesor) |
| Position Third Party Vendor Freelance Inspector Claims Specialist.
Duties & Responsibility
Review of non-conformity reports from the Client, regarding a batch of seamless pipes, valves
Elaborate Site Inspecton Report Flanges Damages evaluations /
Preparing site mechanisms correction according to ASTM/API codes. |
Tecnicas Reunidas OMAN Branch 1/ 2019 - 12/ 2020 tr@tecnicasreunidas.es (Yemen) |
| Construcción - Mantenimiento (Ingeniero técnico) |
| Position Site Civil Supervisor.
Duties & Responsibility
Permit to Work (PTW) Issuer to executing the daily tasks/ Daily Activities Report.
Verify the technical specifications and scope of work to be executed/Elaborate Request for Proposal (STQ) solution in field. Monitoring the work assigned work tasks to every day /
Release to concrete pouring Review drawings d, specifications technical and materials used / Facilitate technical assistance during pre-steel rebars fixing.
Concrete pouring control, and all activities in site. |
ABG-CNN Consortium Construction. 1/ 2021 - 2/ 2022 San Lorenzo Concepcion (Paraguay) |
| Construcción - Mantenimiento (Gerenta/gerente) |
| Position Thermal Insulation Site Manager.
Duties & Responsibility
Elaboration BOQ (Bill of Quotation) of Insulation Materials procure /
Coordinate and Controlling the procure, reception steps.
Elaboration of constructive methods (safety points, dimension , pieces , thinness , finishing ) /
Assure that the method to be applicate correctly Elaboration of execution Plan to Construction/
Verify and correct any deviation.
Coordinate the activities of execution in site and control of Work / Elaborate the daily and weekly reports to manager lines. |
OQ8 Duqm Refinery Sultanate of Oman. 3/ 2022 - 3/ 2024 Duqm, Sultanate of Oman (Yemen) |
| Construcción - Mantenimiento (Coordinador) |
| Position Civil Supervisor
Duties & Responsibility
Witness representative By OQ8 in site for Completion Phase in MCC (Mechanical Completion Certificate), SRC (System Ready Certificate), and STC (System Test certificate).
Identify, Elaborate, Planning and application of the general plan of maintenance Civil (Scaffolding, Insulation, Refractory, concrete works, Steel Structure, and Painting).
Elaborate The Competence plan that will be apply in Static Team Members.
Using of SAP application to management of maintenance task to KPI .it include Elaboration of Work Notifications/materials Request/Daily Reports/ Closing Certifications.
Using of AMAN System (Safety management) to reporting any unsafe condition.
Certificated as an OPITO Certified Competence Assessor Elaborate and implant the assessment of OQ8 Civil Staff. |